December Update
Structural steel erection at the tie-in from Stephens Hall to the new Library Media Center is nearly complete.
The new playground is being assembled.
Excavation of the elevator shaft in the main building has been completed.
Brick installation at the site perimeter walls and columns has been completed, and precast copings are being installed on them.
The North play area has been graded, and the turf system base has been put in place.
Interior and exterior light gauge metal framing installation is well under way.