December Update

  • Structural steel erection at the tie-in from Stephens Hall to the new Library Media Center is nearly complete.

  • The new playground is being assembled.

  • Excavation of the elevator shaft in the main building has been completed.

  • Brick installation at the site perimeter walls and columns has been completed, and precast copings are being installed on them.

  • The North play area has been graded, and the turf system base has been put in place.

  • Interior and exterior light gauge metal framing installation is well under way.