November Update
Concrete slabs have been poured on the elevated decks in the Library Media Center and Stair #3.
Light Gauge Metal Framing is being hung on the third level of the Library Media Center.
Brick is being installed on the site retaining walls and piers.
Elevator shaft in the Main Building is currently 14’W x 14’L x 13’D, and shoring for the 20-foot descent below grade continues to be installed for structural support and safety.