October Update
Steel framing and decking for Stair #3 have been erected and tied into the Library Media Center and Main Building.
Exterior walls are being built on the ground level.
Brick is being installed at the play area retaining walls.
Elevator shaft in the Main Building is currently 14’W x 14’L x 6’D, and shoring is being installed for the 20’ descent below grade.